INDEMNITY BOND
THIS DEED of Indemnity in made this day of _____________ by _______________son of ________________
WHEREAS I am the holder ________________admeasuring ______________ square meters.
AND WHEREAS I propose to construct a building over the said plot of land AND WHEREAS I have submitted the building plan for the construction of the building over the said plot of land for sanction with Building Plan, Online Application No. _______________dated ____________vide 45/58/89of MR & T.P. Act.1966 and under section 253 to 263 of the M.M.C. Act 1949.
AND WHEREAS for sanctioning of the building plan. I have given an undertaking in the form of an affidavit (copy enclosed) to the N.M.C.
AND WHEREAS N.M.C has agreed to sanction the building plan on The aforesaid undertaking :
NOW THIS DEED WITNESSES that in pursuance of the aforesaid affidavit and in consideration of N.M.C. having agreed to sanction of the building plan submitted Online Application No____________, dated ____________in respect of the plot of land situated at and referred to above, I hereby undertake to indemnity and keep harmless the N.M.C. from all proceedings in courts and before other authorities including the competent authority and other authorities appointed under the Urban Land ( Ceiling and Regulation ) Act 1976. All expenses / losses / claims which the N.M.C. may incur or become liable to pay as a result or in consequence, of the Sanction accorded by it to the building plan in respect of the aforesaid plot.
I further state that I and all my successors-in-interest shall abide by the aforesaid terms and conditions of this Deed of Indemnity.
Witnesses:-
- Name – _________________________________
Sign – _________________________________
Res. Address – _________________________________
- Name – _________________________________
Sign – _________________________________
Res. Address – _________________________________
Applicant Authorized Signatory
Affidavit and Indemnity Bond Formats for Builder Demands: Complying with Nagpur Municipal Corporation Regulations for Commercial and Residential Projects
AFFIDAVIT
Affidavit of __________ son of _________ resident of _________________ I, ______________ do hereby solemnly affirm and declare as under:-
1) That I am the plot owner of ________________ admeasuring _____________square meters.
2) That I propose to construct a building over the aforesaid plot of land.
3) That I have submitted the plan for the construction of a building over the side plot of land for sanction vide my letter dated No_____________________
4) That the aforesaid plot of land is the only plot of vacant land held by me in any of the urban agglomerations covered under the Urban land (Ceiling and Regulation) Act 1975 and that the extent of that plot is not within the ceiling limit on vacant land imposed by the said Act.
Applicant
(House owner)
Affidavit and Indemnity Bond Formats for Builder Demands: Complying with Nagpur Municipal Corporation Regulations for Commercial and Residential Projects
AFFIDAVIT
I, __________________ the undersigned, Applicant/Builder/Developer make an affidavit, that I have obtained the commencement certificate vide letter No._______________ Date __________ for the construction of the _____________ to construct a building as per approved building plan. As per the provision available in Unified Development Control & Promotions Regulation – 2020 vide Regulation No. 2.2 & 2.7, the Hon. Municipal Commissioner, Nagpur abide part occupancy / part occupancy according to Unified Development Control & Promotions Regulation – 2020 Clause No. 2.11, for the complete construction within stipulated period. I assure to get part occupancy certificate from the concern authority within stipulated period as per the circular.
I also give an affidavit that, allottees of the building are not entitled to enter in the building and not use the building prior to receipt of occupancy or part occupancy certificate.
I do follow all the guide lines mentioned in the Unified Development Control & Promotions Regulation – 2020 Clause No. 2.10 & 2.11, for the part occupancy or occupancy, for the construction of the building.
Applicant
Authorized Signatory
Affidavit and Indemnity Bond Formats for Builder Demands: Complying with Nagpur Municipal Corporation Regulations for Commercial and Residential Projects
FSI AREA CALCULATION | ||
1 | AREA | |
2 | TOD ZONE FSI | |
3 | ANCILLARY FSI PERMISSIBLE ( 60%) | |
4 | TOTAL PERMISSIBLE FSI | |
5 | TOTAL BUILT UP AREA | |
6 | SALEABLE AREA COMMERCIAL (45 %) | |
7 | TOTAL SALEABLE AREA | |
ASSUMPTION | PROJECT | |
1 | PROJECT TENURE | |
2 | LAND AREA | IN SQ FEET |
3 | BUILT UP AREA | |
4 | SALEABLE AREA | |
5 | LAND COST | |
6 | STAMP DUTY, REGISTRATION & OTHER CHARGES | RS CR |
7 | PAID TO LAND OWNER | RS CR |
8 | CONSTRUCTION COST | RS PER SQ FT |
9 | SITE DEVELOPMENT | RS PER SQ FT |
10 | MARKETING, ADVERTISEMENT & OTHER OVERHEAD | RS PER SQ FT |
11 | ARCHITECT AND CONSULTANT FEE | RS PER SQ FT |
12 | INTEREST COST | RS PER SQ FT |
13 | TOTAL SALEABLE AREA | SQ FT |
14 | COMMERCIAL AREA | SQ FT |
15 | IT / TECHNOLOGY / OTHER OFFICE AREA | SQ FT |
16 | BASE SALE PRICE OF COMMERCIAL AREA | RS PER SQ FT |
17 | BASE SALE PRICE OF OFFICE AREA | RS PER SQ FT |
COST OF PROJECT | ||
1 | CONSTRUCTION COST | IN CR |
2 | SITE DEVELOPMENT | IN CR |
3 | MARKETING & ADVERTISEMENT & OTHER CHARGES | IN CR |
4 | ARCHITECT & CONSULTANT CHARGES | IN CR |
5 | TOTAL COST OF PROJECT | IN CR |
DEVELOPER PAID TO OWNER | ||
1 | LAND COST | |
2 | STAMP DUTY, REGISTRATION & OTHER CHARGES | |
3 | PAID TO LAND OWNER | |
4 | DEVELOPER PAID TO OWNER TOTAL | |
INCOME GENNERATED FROM PROJECT | ||
1 | SALE OF COMMERCIAL AREA | |
2 | SALE OF IT / TECHNOLOGY / OTHER OFFICE AREA | |
3 | TOTAL INCOME FROM PROJECT | |
PROFITABILITY STATEMENT | ||
1 | TOTAL COST OF PROJECT | IN CR |
2 | TOTAL INCOME FROM PROJECT | IN CR |
3 | PROFIT BEFORE TAX | IN CR |
4 | TAX @33% | IN CR |
5 | PROFIT AFTER TAX | IN CR |
PROFITABILITY STATEMENT WITH INFLATION RATE @ 4% PER YEAR AFTER 5 YEAR | ||
1 | TOTAL COST OF PROJECT AFTER INFLATION | IN CR |
2 | TOTAL INCOME FROM PROJECT | IN CR |
3 | PROFIT BEFORE TAX | IN CR |
4 | TAX @33% | IN CR |
5 | PROFIT AFTER TAX | IN CR |
Affidavit and Indemnity Bond Formats for Builder Demands: Complying with Nagpur Municipal Corporation Regulations for Commercial and Residential Projects
PLOT AREA | BASIC FSI | 50% PAID FSI | TDR | TOTAL POTENTIAL | ANCILARY AREA 80% OR 60% | P LINE |
1.10 | 0.50 | 1.15 | 2.75 | 60% | ||
PERMISSIBLE | ||||||
PROPOSED | X |
SR NO | PARTICULARS | AMOUNT AS PER SUBMITTED | AMOUNT AS PER OLD SANCTIONED | AMOUNT TO BE DEPOSITED |
1 | Plan Registration Fees X x 5/- = | |||
2 | Security Deposit ( Earth removal etc ) 1% of EST COST or Max Rs 75,000/- X x 1% est cost = | |||
3 | Building Material stacking charges ½ % of Est. Cost or Max Rs 50,000/- X x ½ % est cost = | |||
4 | Ancillary Area Charges X x 30950 x 10% = | |||
5 | Sewer connection charges Commercial X x 5/- = Residential X x 2.5/- = | |||
6 | TDR Area Charges Y x X X 30 % X 3% = Y X 100/- = | |||
TOTAL |
- B) LEVIABLE CHARGES FOR DEVELOPMENT CHARGES
SR NO | PARTICULARS | AMOUNT AS PER SUBMITTED | AMOUNT AS PER OLD SANCTIONED | AMOUNT TO BE DEPOSITED |
DEVELOPMENT CHARGES COMMERCIAL X x 30950 X 4% = Residential X x 30950 X 2% = | ||||
TOTAL |
- C) LEVIABLE CHARGES FOR 50% PAID FSI CHARGES
SR NO | PARTICULARS | AMOUNT AS PER SUBMITTED | AMOUNT AS PER OLD SANCTIONED | AMOUNT TO BE DEPOSITED |
50% PAID FSI CHARGES X x 55000 x 35% = Y-Z 50% NMC SHARE = 50% GOVT SHARE = | ||||
TOTAL |
- C) LEVIABLE CHARGES FOR TREE PLANTATION
SR NO | PARTICULARS | AMOUNT AS PER SUBMITTED | AMOUNT AS PER OLD SANCTIONED | AMOUNT TO BE DEPOSITED |
SECURITY DEPOSIT ( FOR 02 NOS OF TREES ) 02 x 500 = ( MAX 25,000/-) | ||||
TOTAL |
- D) LEVIABLE CHARGES FOR HERITAGE FUND
SR NO | PARTICULARS | AMOUNT AS PER SUBMITTED | AMOUNT AS PER OLD SANCTIONED | AMOUNT TO BE DEPOSITED |
HERITAGE FUND @ 2% OF DEVELOPMENT CHARGES X x 2 % of Dev Charges = | ||||
TOTAL |
- E) LEVIABLE CHARGES FOR LABOUR WELFARE CESS
SR NO | PARTICULARS | AMOUNT AS PER SUBMITTED | AMOUNT AS PER OLD SANCTIONED | AMOUNT TO BE DEPOSITED |
LABOUR WELFARE CESS @1% OF R.R. CONSTRUCTION COST X x 26620 x 1% = | ||||
TOTAL |
Affidavit and Indemnity Bond Formats for Builder Demands: Complying with Nagpur Municipal Corporation Regulations for Commercial and Residential Projects
AREA STATEMENT INCLUDES :
- DESCRIPTION : FLOOR / SHOP
- CARPET AREA : RERA CARPET AREA / ENCLOSED BALCONY / BALCONY & TERRACE AREA / SERVICE LEDGE / TOTAL USABLE AREA
- BUILTUP AREA : BUILTUP AREA / ENCLOSED BALCONY / OPEN BALCONY & TERRACE AREA / SERVICE LEDGE / NET BUILTUP AREA
- COMMON AREA LOADING : TOILET / NON APPROCHABLE TERRACE / REFUGE / PASSAGE AREA / FIRE STAIRCASE WITH LIFT & LOBBY / PARKING AREA / RECREATIONAL AREA
- SUPER BUILTUP AREAS: SUPERBUILTUP AREA IN SQ MT / SUPERBUILTUP AREA IN SQ FT
- LOADING RATIO OF CARPET / SUPER BUILTUP : AS ACTUALS / ACCORDING TO 65 %
FLOOR WISE COMMON AREA :
- TOILET
- NON APPROCHABLE TERRACE
- REFUGE AREA
- PASSAGE AREA
- FIRE STAIRCASE & FIRE LIFT
- MAIN STAIRCASE WITH LIFT & LOBBY
- PARKING
- RECREATIONAL AREA
Tentative Demand Calculation Charges NMC : –
TD R. Conversion / Transfer Charges |
Administrative fees |
Development Fund / Improvement Size (Peripheral Development Expenditure) |
Mitigation charges |
Building drawing inspection fee |
Building materials charges |
building sketch registration fee |
Building permit fee |
periodic inspection fee |
Ancillary Area |
Administrative charges levied for sewerage connection |
Land Transferable Development Rights Premium and and burden premium charges |
narrow eye |
Deposit amount |
Deposit (Amount to be taken at the time of issue of building permit |
M. Prof. Ni. And the construction development fee charged under section 124/B of the Town Planning Act |
M. Prof. Ni. and land development charges levied under Section 124/B of the Town Planning Act |
M. Prof. Ni. and Building Development Charges levied under Section 124 of the Town Planning Act (under Addl. FSI 124/J) |
Additional carpet area under Nagpur Metro Rail Corridor |
Land transferable development rights premium and burden premium charges |
Heritage Fund |
Tree Conservation Fee |
Construction Workers Welfare Cess Fund (1 percent of construction cost) |
Tentative Demand Calculation Charges NIT :
SCRUTINY CHARGES / ADDITIONAL SCRUTINY CHARGES FOR DIFF. IN BUILT AREA | |||||
BUILDING CONSTRUCTION CHARGES | |||||
STACKING CHARGES | |||||
SECURITY DEPOSIT | |||||
RAIN WATER HARVESTING DEPOSIT | |||||
EMD FOR TREE PLANTATION | |||||
BKKU (BANDHAKAM KAMGAR KALYAN UP-KAR | |||||
HERITAGE FUND | |||||
ADDITIONAL REGULARISATION CHARGES FOR TRANSFER OF PROPERTY @RS. 16/SQ.FT (PLOT AREA SQ.MT X REGULARIZATION RATE FOR PLOT AREA SQ.MT)
|
BASEMENT |
Electrical Internal Wall Conduit |
Internal Plaster |
Floor Chipping & Cleaning |
Trimix |
Tiles |
External plumbing |
Common Lobby Flooring |
Common Lobby doors |
Common Lobby Dado |
Main Staircase Flooring |
Main Staircase Railing |
Main Staircase Wiring |
Main Staircase Fixtures |
Garbage Chute Works |
Fire Staircase Flooring |
Fire Staircase Railing |
Fire Staircase Wiring |
Fire Staircase Fixtures |
External Brickwork for Ramp |
Racks for DG on Ramp |
Sensors |
Footlamps |
Traffic signal painting |
Signanges and boards |
Basement Ventilation |
Testing of Fire Works |
Fire Door |
BRICK WORK (UPTO LINTEL) |
LINTEL CASTING |
BRICK WORK (FINAL) |
CONCEALED PLUMBING |
FLOOR CHIPPING & CLEANING |
ELETRICAL FLOOR CONDUIT |
LIFT WALL BRICKWORK |
LIFT WALL PLASTER |
LIFT OPENING GRANITE JAMMING |
COMMON LOBBY PLASTER |
COMMON LOBBY WALL TILE/PAINT |
COMMON LOBBY FLOOR TILE FIXING |
COMMON LOBBY LIGHT FIXING |
LIFT INNER PLASTER |
LIFT INNER WHITE WASH |
LIFT INNER LIGHT INSTALATION |
LIFT INSTALATION |
LIGHTS FITTINGS |
SITE CLEANING |
FIRE SPRINKLERS AND WORKS |
EARTHING PIT |
RNU |
GROUND FLOOR (PARKING) |
Final Brickwork |
Internal Plaster |
Internal Paint |
External Plaster |
External Paint |
External plumbing |
Common Lobby Flooring |
Common Lobby doors |
Internal Door Fittings |
Main Staircase Flooring |
Main Staircase Railing |
Main Staircase Wiring |
Main Staircase Fixtures |
Fire Doors |
Fire Staircase Flooring |
Fire Staircase Railing |
Fire Staircase Wiring |
Fire Staircase Fixtures |
Concealed Plumbing |
Electrical floor and wall conduit |
Floor Tiles and Skirting |
Parking Tiles |
Common Lobby Dado |
Window Fitting |
Door Jamming |
Window Jamming |
Meter Panel Wiring |
Meter Panel Installation |
Transformer Platform |
Transformer Installation |
Transformer Wiring |
Compound wall Foundation |
Compound wall Plaster |
Compound wall Painting |
Guard Room Brickwork |
Guard Room External Plaster |
Guard Room External Painting |
Guard Room Internal Plaster |
Guard Room Internal Painting |
Main Gate Installation and MS |
Lift Opening Granite Jamming |
Lift Inner Plaster |
Lift Inner Light |
Lift Installation |
Signanges |
DG |
Entrance Lobby desk and Chairs |
ICT Works |
Fire Works and testing |
Walkway Pergolas |
MS Structures for Pergolas |
WINDOW FRAMING |
WINDOW FIXING |
LIFT WALL BRICKWORK |
LIFT WALL PLASTER |
LIFT OPENING GRANITE JAMMING |
COMMON LOBBY PLASTER |
COMMON LOBBY WALL TILE/PAINT |
COMMON LOBBY FLOOR TILE FIXING |
COMMON LOBBY LIGHT FIXING |
LIFT INNER PLASTER |
LIFT INNER WHITE WASH |
LIFT INNER LIGHT INSTALATION |
LIFT INSTALATION |
LIGHTS FITTINGS |
SITE CLEANING |
FIRE SPRINKLERS AND WORKS |
EXTERNAL VERTICLE PLUMBING |
FIRE PUMPS |
FIRST FLOOR : |
Tiling of Toilets |
Waterproofing of Toilets |
Dado of toilets |
Internal Plaster |
Internal Paint |
Common Lobby Flooring |
Common Lobby doors |
Main Staircase Flooring |
Main Staircase Railing |
Main Staircase Wiring |
Main Staircase Fixtures |
Fire Staircase Flooring |
Fire Staircase Railing |
Fire Staircase Wiring |
Fire Staircase Fixtures |
Concealed Plumbing |
Electrical floor and wall conduit |
Floor Tiles and Skirting |
Common Lobby Dado |
Window Fitting |
Door Jamming |
Window Jamming |
Door Fitting |
Light Switches |
Lift Opening Jamming |
Common Lobby Light Fixing |
Lift Inner Plaster |
Lift Inner Light |
Lift Installation |
Vertical Plumbing |
External Glazing |
Internal Glazing |
External Development |
Façade |
Façade Lighting |
Gym Equipments |
Party Hall overall Cost |
Game Zone equipemts and overall |
Gym Flooring |
Party Hall Flooring |
Game Zone Flooring |
Entrance Lobby desk and Chairs |
ICT Works |
Fire Works and testing |
Fire Door |
SWIMMING POOL ELETRIC CONDUICTING |
SWIMMING POOL CONCELED PLUMBNG |
SWIMMING POOL WALL CASTING |
SWIMMING POOL PLASTER |
SWIMMING POOL TILING |
SWIMMING POOL GROUTING |
SWIMMING POOL ELETRICAL AND PLUMBING FITTING |
SWIMMING POOL FILTRATION PLANT & OTHER EQUIPMENT INSTALATION |
SWIMMING POOL/TESTING & COMMENCING |
Gym Ligting and wiring |
Party Hall Ligting and wiring |
Game Zone Ligting and wiring |
BRICK WORK (UPTO LINTEL) |
LINTEL CASTING |
BRICK WORK (FINAL) |
ELECTRICAL INTERNAL WALL CONDUIT |
TOILET, KITCHEN PLASTER |
CONCEALED PLUMBING |
External Plaster |
SANITARY FITTING INSTALATION |
ELETRICAL WIRING |
INTERNAL PAINTING |
LIGHTS & SWITCHES INSTALATION |
EXTERNAL VERTICAL PLUMBING |
EXTERNAL PLUMBING/SEWERAGE |
EXTERNAL GLAZING |
EXTERNAL FINISH (DUCT COVER) |
GLASS WORKS (EXTERNAL) |
FIRE DOORS |
TYPICAL FLOOR |
BRICK WORK (UPTO LINTEL) |
LINTEL CASTING |
BRICK WORK (FINAL) |
ELECTRICAL INTERNAL WALL CONDUIT |
TOILET, KITCHEN PLASTER |
INTERNAL GYPROC PLASTER |
CONCEALED PLUMBING |
BATHROOM WATERPROOFING |
FLOOR CHIPPING & CLEANING |
ELETRICAL FLOOR CONDUIT |
BATHROOM WALL TILES |
BATHROOM FLOOR TILES FIXING |
BALCONY WATERPROOFING |
FRONT EXTERNAL PLASTER |
RIGHT SIDE EXTERNAL PLASTER |
LEFT SIDE EXTERNAL PLASTER |
BACK SIDE EXTERNAL PLASTER |
TOILET GRANITE DOORS FRAMING |
WINDOW GRANITE FRAMING |
FLOOR TILES & SKIRTING |
KITCHEN OTA FIXING |
KITCHEN DADO |
COMMON LOBBY DADO |
COMMON LOBBY TILE FITTING |
WINDOW FITTING |
MAIN DOOR AND INTERNAL DOORS FITTING |
SANITARY FITTING INSTALATION |
ELETRICAL WIRING |
INTERNAL PAINTING |
LIGHTS & SWITCHES INSTALATION |
METER PANNEL TO FLAT WIRING |
COMMON LOBBY ELETRICAL CONDUIT |
MAIN STARICASE ELETRICAL |
FIRE STAIRCASE ELETRICAL |
LIFT WALL BRICKWORK |
LIFT WALL PLASTER |
LIFT OPENING GRANITE JAMMING |
COMMON LOBBY PLASTER |
MAIN STAIRCASE PLASTER |
FIRE STAIRCASE PLASTER |
COMMON LOBBY WALL TILE/PAINT |
COMMON LOBBY FLOOR TILE FIXING |
MAIN STAIRCASE STEPS & MIDLANDING GRANITE FXING |
FIRE STAIRCASE STEPS & MIDLANDING GRANITE FXING |
COMMON LOBBY LIGHT FIXING |
STAIRCASE LIGHT FIXING |
LIFT INNER PLASTER |
LIFT INNER WHITE WASH |
LIFT INNER LIGHT INSTALATION |
LIFT INSTALATION |
TERRACE WATERPROOFING |
EXTERNAL VERTICAL PLUMBING |
EXTERNAL PLUMBING/SEWERAGE |
COMMON LOBBY FLOORING |
MAIN STAIRCASE STAIRCASE RAILING |
FIRE STAIRCASE RAILING |
EXTERNAL GLAZING |
EXTERNAL FINISH (DUCT COVER) |
HORTICULTURE |
LIGHTS FITTINGS |
SITE CLEANING |
FAÇADE |
FAÇADE LIGHTING |
ENTRANCE LOBBIES DESK AND CHAIRS |
OHWT |
HVAC |
ICT WORKS |
FIRE SPRINKLERS AND WORKS |
ACP WORKS |
GLASS WORKS (EXTERNAL) |
FIRE DOORS |
PENTHOUSE |
BRICK WORK (UPTO LINTEL) |
MS LINTEL PLATES |
LINTEL CASTING |
BRICK WORK (FINAL) |
ELECTRICAL INTERNAL WALL CONDUIT |
TOILET, KITCHEN PLASTER |
INTERNAL GYPROC PLASTER |
CONCEALED PLUMBING |
BATHROOM WATERPROOFING |
FLOOR CHIPPING & CLEANING |
ELETRICAL FLOOR CONDUIT |
BATHROOM WALL TILES |
BATHROOM FLOOR TILES FIXING |
BALCONY WATERPROOFING |
FRONT EXTERNAL PLASTER |
RIGHT SIDE EXTERNAL PLASTER |
LEFT SIDE EXTERNAL PLASTER |
BACK SIDE EXTERNAL PLASTER |
TOILET GRANITE DOORS FRAMING |
WINDOW GRANITE FRAMING |
FLOOR TILES & SKIRTING |
KITCHEN OTA FIXING |
KITCHEN DADO |
COMMON LOBBY DADO |
COMMON LOBBY TILE FITTING |
WINDOW FITTING |
MAIN DOOR AND INTERNAL DOORS FITTING |
SANITARY FITTING INSTALATION |
ELETRICAL WIRING |
INTERNAL PAINTING |
LIGHTS & SWITCHES INSTALATION |
SWIMMING POOL PLANT ROOM PLUMBING |
SWIMMING POOL PLANT ROOM MACHINES |
JACCUZZI FLOORING |
WATERFALL WALL DEVELOPMENT |
SWIMMING POOL ELETRIC CONDUICTING |
SWIMMING POOL CONCELED PLUMBNG |
SWIMMING POOL WALL CASTING |
SWIMMING POOL PLASTER |
SWIMMING POOL TILING |
SWIMMING POOL GROUTING |
SWIMMING POOL ELETRICAL AND PLUMBING FITTING |
SWIMMING POOL FILTRATION PLANT & OTHER EQUIPMENT INSTALATION |
SWIMMING POOL/TESTING & COMMENCING |
METER PANNEL TO FLAT WIRING |
ITC RACKS |
PRIVATE LIFT |
INTERNAL STAIRCASE FLOORING |
INTERNAL STAIRCASE RAILING |
INTERNAL STAIRCASE LIGHTING |
INTERNAL LANDSCAPE NEAR INTERNAL STAIRCASE |
INTERNAL LANDSCAPE NEAR INTERNAL STAIRCASE CONDUIT |
INTERNAL LANDSCAPE NEAR INTERNAL STAIRCASE WATERPROOFING |
INTERNAL LANDSCAPE NEAR INTERNAL STAIRCASE ELECTRCAL FIXTURES |
INTERNAL LANDSCAPE NEAR INTERNAL STAIRCASE WIRING |
INTERNAL LANDSCAPE NEAR INTERNAL STAIRCASE DRIPPING SYSTEM |
COMMON LOBBY ELETRICAL CONDUIT |
MAIN STARICASE ELETRICAL |
FIRE STAIRCASE ELETRICAL |
LIFT WALL BRICKWORK |
LIFT WALL PLASTER |
LIFT OPENING GRANITE JAMMING |
COMMON LOBBY PLASTER |
MAIN STAIRCASE PLASTER |
FIRE STAIRCASE PLASTER |
COMMON LOBBY WALL TILE/PAINT |
COMMON LOBBY FLOOR TILE FIXING |
MAIN STAIRCASE STEPS & MIDLANDING GRANITE FXING |
FIRE STAIRCASE STEPS & MIDLANDING GRANITE FXING |
COMMON LOBBY LIGHT FIXING |
STAIRCASE LIGHT FIXING |
LIFT INNER PLASTER |
LIFT INNER WHITE WASH |
LIFT INNER LIGHT INSTALATION |
LIFT INSTALATION |
TERRACE WATERPROOFING |
EXTERNAL VERTICAL PLUMBING |
EXTERNAL PLUMBING/SEWERAGE |
AUTOMATION WORKS |
FIRE WORKS |
COMMON LOBBY FLOORING |
BALCONY STEPS CIVIL |
BALCONY STEPS WATERPROOFING |
BALCONY STEPS FLOORING |
BALCONY STEPS RAILING |
SOLAR WORKS |
MAIN STAIRCASE STAIRCASE RAILING |
FIRE STAIRCASE RAILING |
EXTERNAL GLAZING |
EXTERNAL FINISH (DUCT COVER) |
HORTICULTURE |
LIGHTS FITTINGS |
SITE CLEANING |
FAÇADE |
FAÇADE LIGHTING |
EXTERNAL DEVELOPMENT |
GYM EQUIPMENTS AND OTHER AMMENITIES |
GYM FLOORING |
GYM LIGHT FIXTURES |
GYM WIRING AND CONDUITING |
PARTY DECK FLOORING |
PARTY DECK LIGHTING FIXTURES |
PARTY DECK WIRING AND CONDUITING |
STEAM AREA FLOORING |
STEAM AREA INTERNAL PLASTER |
STEAM AREA FIXTURES |
STEAM AREA WIRING AND CONDUITING |
MASSAGE ROOM FLOORING |
MASSAGE ROOM INTERNAL PLASTER |
MASSAGE ROOM FIXTURES |
MASSAGE ROOM WIRING AND CONDUITING |
LIGHTENING ARRESTOR |
PERGOLAS |
GYM EQUIPMENTS AND OTHER AMMENITIES |
PARTY HALL |
GAME ZONE |
ENTRANCE LOBBIES DESK AND CHAIRS |
GYPSUM PARTITIONS |
OHWT |
HVAC |
ICT WORKS |
FIRE SPRINKLERS AND WORKS |
FIRE PUMPS |
ACP WORKS |
GLASS WORKS (EXTERNAL) |
FIRE DOORS |
GARBAGE CHUTE WORKS |
KITCHEN AREA MODULAR DESIGN |
KITCHEN APPLIANACES |
DINNING AREA JHULA |
GLASS PARTITIONS |
BISON BOARD PARTITIONS |
ACCOUSTIC PANELS |
SPEAKERS – THEATRE ROOM |
THEATRE ROOM – FLOORING |
POP FOR ALL AREAS |
PUNNING FOR ALL AREAS |
FIXED FURNITURE |
LOOSE FURNITURE |
ROOF STRUCTURE |
FABRICATIONS |
FINAL POLISHING |
1 SQ METER = 10.764 SQ FT
1 ACRE = 43,560 SQ FT
1 HECTARE = 2.47 ACRES
1 SQ YARD = 9 SQ FT
1 SQ KM = 247.1 ACRES
1 SQ MILE = 640 ACRES
1 GUNTHA = 1089 SQ FT
1 CENT = 435.6 SQ FT
100 CENT = 1 ACRE
1 ANKANAM = 72 SQ FT
1 GAJ = 9 SQ FT
1 CHATAK = 45 SQ FT
1 MARLA = 272 SQ FT
1 KANAL = 5445 SQ FT
8 KANAL = 1 ACRE
1 ARE = 1076.4 SQ FT
1 GROUND = 2400 SQ FT