Realtybills Affidavit and Indemnity Bond Formats for Builder Demands: Complying with Nagpur Municipal Corporation Regulations for Commercial and Residential Projects

Affidavit and Indemnity Bond Formats for Builder Demands: Complying with Nagpur Municipal Corporation Regulations for Commercial and Residential Projects

Affidavit and Indemnity Bond Formats for Builder Demands: Complying with Nagpur Municipal Corporation Regulations for Commercial and Residential Projects

INDEMNITY BOND

 THIS DEED of Indemnity in made this day of _____________ by _______________son of ________________

WHEREAS I am the holder ________________admeasuring ______________ square meters.

AND WHEREAS I propose to construct a building over the said plot of land AND WHEREAS I have submitted the building plan for the construction of the building over the said plot of land for sanction with Building Plan, Online Application No. _______________dated ____________vide 45/58/89of MR & T.P. Act.1966 and under section 253 to 263 of the M.M.C. Act 1949.

AND WHEREAS for sanctioning of the building plan. I have given an undertaking in the form of an affidavit (copy enclosed) to the N.M.C.

AND WHEREAS N.M.C has agreed to sanction the building plan on The aforesaid undertaking :

NOW THIS DEED WITNESSES that in pursuance of the aforesaid affidavit and in consideration of N.M.C. having agreed to sanction of the building plan submitted Online Application No____________, dated ____________in respect of the plot of land situated at and referred to above, I hereby undertake to indemnity and keep harmless the N.M.C. from all proceedings in courts and before other authorities including the competent authority and other authorities appointed under the Urban Land ( Ceiling and Regulation ) Act 1976. All expenses / losses / claims which the N.M.C. may incur or become liable to pay as a result or in consequence, of the Sanction accorded by it to the building plan in respect of the aforesaid plot.

 I further state that I and all my successors-in-interest shall abide by the aforesaid terms and conditions of this Deed of Indemnity.

Witnesses:-

  • Name – _________________________________

Sign – _________________________________

Res. Address – _________________________________

 

  • Name – _________________________________

Sign – _________________________________

Res. Address – _________________________________

 

 

 

Applicant Authorized Signatory

Affidavit and Indemnity Bond Formats for Builder Demands: Complying with Nagpur Municipal Corporation Regulations for Commercial and Residential Projects

AFFIDAVIT

 Affidavit of __________ son of _________ resident of _________________ I, ______________ do hereby solemnly affirm and declare as under:-

 1) That I am the plot owner of ________________ admeasuring _____________square meters.

 2) That I propose to construct a building over the aforesaid plot of land.

3) That I have submitted the plan for the construction of a building over the side plot of land for sanction vide my letter dated No_____________________

4) That the aforesaid plot of land is the only plot of vacant land held by me in any of the urban agglomerations covered under the Urban land (Ceiling and Regulation) Act 1975 and that the extent of that plot is not within the ceiling limit on vacant land imposed by the said Act.

 

 

 

Applicant

(House owner)

 

Affidavit and Indemnity Bond Formats for Builder Demands: Complying with Nagpur Municipal Corporation Regulations for Commercial and Residential Projects

AFFIDAVIT

      I, __________________ the undersigned, Applicant/Builder/Developer make an affidavit, that I have obtained the commencement certificate vide letter No._______________ Date __________ for the construction of the _____________ to construct a building as per approved building plan. As per the provision available in Unified Development Control & Promotions Regulation – 2020 vide Regulation No. 2.2 & 2.7, the Hon. Municipal Commissioner, Nagpur abide part occupancy / part occupancy according to Unified Development Control & Promotions Regulation – 2020 Clause No. 2.11, for the complete construction within stipulated period. I assure to get part occupancy certificate from the concern authority within stipulated period as per the circular.

I also give an affidavit that, allottees of the building are not entitled to enter in the building and not use the building prior to receipt of occupancy or part occupancy certificate.

I do follow all the guide lines mentioned in the Unified Development Control & Promotions Regulation – 2020 Clause No. 2.10 & 2.11, for the part occupancy or occupancy, for the construction of the building.

 

 

Applicant

 

Authorized Signatory

Affidavit and Indemnity Bond Formats for Builder Demands: Complying with Nagpur Municipal Corporation Regulations for Commercial and Residential Projects

 FSI AREA CALCULATION 
1AREA 
2TOD  ZONE FSI 
3ANCILLARY FSI PERMISSIBLE ( 60%) 
4TOTAL PERMISSIBLE FSI 
5TOTAL BUILT UP AREA 
6SALEABLE AREA COMMERCIAL (45 %) 
7TOTAL SALEABLE AREA 
   
   
 ASSUMPTIONPROJECT
1PROJECT TENURE 
2LAND AREAIN SQ FEET
3BUILT UP AREA 
4SALEABLE AREA 
5LAND COST 
6STAMP DUTY, REGISTRATION & OTHER CHARGESRS CR
7PAID TO LAND OWNERRS CR
8CONSTRUCTION COSTRS PER SQ FT
9SITE DEVELOPMENTRS PER SQ FT
10MARKETING, ADVERTISEMENT & OTHER OVERHEADRS PER SQ FT
11ARCHITECT AND CONSULTANT FEERS PER SQ FT
12INTEREST COSTRS PER SQ FT
13TOTAL SALEABLE AREASQ FT
14COMMERCIAL AREASQ FT
15IT / TECHNOLOGY / OTHER OFFICE AREASQ FT
16BASE SALE PRICE OF COMMERCIAL AREARS PER SQ FT
17BASE SALE PRICE OF OFFICE AREARS PER SQ FT
   
 COST OF PROJECT 
1CONSTRUCTION COSTIN CR
2SITE DEVELOPMENTIN CR
3MARKETING & ADVERTISEMENT & OTHER CHARGESIN CR
4ARCHITECT & CONSULTANT CHARGESIN CR
5TOTAL COST OF PROJECTIN CR
   
   
 DEVELOPER PAID TO OWNER 
1LAND COST 
2STAMP DUTY, REGISTRATION & OTHER CHARGES 
3PAID TO LAND OWNER 
4DEVELOPER PAID TO OWNER TOTAL 
   
   
   
 INCOME GENNERATED FROM PROJECT 
1SALE OF COMMERCIAL AREA 
2SALE OF IT / TECHNOLOGY / OTHER OFFICE AREA 
3TOTAL INCOME FROM PROJECT 
   
   
 PROFITABILITY STATEMENT 
1TOTAL COST OF PROJECTIN CR
2TOTAL INCOME FROM PROJECTIN CR
3PROFIT BEFORE TAXIN CR
4TAX @33%IN CR
5PROFIT AFTER TAXIN CR
   
   
 PROFITABILITY STATEMENT WITH INFLATION RATE @ 4% PER YEAR AFTER 5 YEAR 
1TOTAL COST OF PROJECT AFTER INFLATIONIN CR
2TOTAL INCOME FROM PROJECTIN CR
3PROFIT BEFORE TAX IN CR
4TAX @33%IN CR
5PROFIT AFTER TAXIN CR
Affidavit and Indemnity Bond Formats for Builder Demands: Complying with Nagpur Municipal Corporation Regulations for Commercial and Residential Projects

PLOT AREA

BASIC FSI

50% PAID FSI

TDR

TOTAL POTENTIAL

ANCILARY AREA 80% OR 60%

P LINE

 

1.10

0.50

1.15

2.75

60%

 

PERMISSIBLE

      

PROPOSED

     

X

 

 

SR NO

PARTICULARS

AMOUNT AS PER SUBMITTED

AMOUNT AS PER OLD SANCTIONED

AMOUNT TO BE DEPOSITED

1

Plan Registration Fees      X x 5/- =

   

2

Security Deposit ( Earth removal etc ) 1% of EST COST or

Max Rs 75,000/-

X x 1% est cost =

   

3

Building Material stacking charges ½ % of Est. Cost or Max Rs 50,000/-   X x ½  % est cost =

   

4

Ancillary Area Charges    X   x  30950 x 10% = 

   

5

Sewer connection charges

Commercial

X   x 5/-  =

Residential

X   x 2.5/- =

   

6

TDR Area Charges

Y x X X 30 % X 3% =

Y X 100/- =

   
 

TOTAL

   
  1. B) LEVIABLE CHARGES FOR DEVELOPMENT CHARGES

SR NO

PARTICULARS

AMOUNT AS PER SUBMITTED

AMOUNT AS PER OLD SANCTIONED

AMOUNT TO BE DEPOSITED

 

DEVELOPMENT CHARGES

COMMERCIAL

 X x 30950 X 4% =

Residential

 X x 30950 X 2% =

   
 

TOTAL

   
  1. C) LEVIABLE CHARGES FOR 50% PAID FSI CHARGES

SR NO

PARTICULARS

AMOUNT AS PER SUBMITTED

AMOUNT AS PER OLD SANCTIONED

AMOUNT TO BE DEPOSITED

 

50% PAID FSI CHARGES

X x 55000 x 35%  =  Y-Z

50% NMC SHARE =

50% GOVT SHARE =

   
 

TOTAL

   
  1. C) LEVIABLE CHARGES FOR TREE PLANTATION

SR NO

PARTICULARS

AMOUNT AS PER SUBMITTED

AMOUNT AS PER OLD SANCTIONED

AMOUNT TO BE DEPOSITED

 

SECURITY DEPOSIT ( FOR 02 NOS OF TREES ) 02 x 500 =

( MAX 25,000/-)

   
 

TOTAL

   
  1. D) LEVIABLE CHARGES FOR HERITAGE FUND

SR NO

PARTICULARS

AMOUNT AS PER SUBMITTED

AMOUNT AS PER OLD SANCTIONED

AMOUNT TO BE DEPOSITED

 

HERITAGE FUND @ 2% OF  DEVELOPMENT CHARGES   X x 2 % of Dev Charges  =

   
 

TOTAL

   
  1. E) LEVIABLE CHARGES FOR LABOUR WELFARE CESS

SR NO

PARTICULARS

AMOUNT AS PER SUBMITTED

AMOUNT AS PER OLD SANCTIONED

AMOUNT TO BE DEPOSITED

 

LABOUR WELFARE CESS @1% OF R.R. CONSTRUCTION COST

X x 26620  x 1% =

   
 

TOTAL

   
Affidavit and Indemnity Bond Formats for Builder Demands: Complying with Nagpur Municipal Corporation Regulations for Commercial and Residential Projects

AREA STATEMENT INCLUDES :

  1. DESCRIPTION : FLOOR / SHOP
  2. CARPET AREA : RERA CARPET AREA / ENCLOSED BALCONY / BALCONY & TERRACE AREA / SERVICE LEDGE / TOTAL USABLE AREA
  3. BUILTUP AREA : BUILTUP AREA / ENCLOSED BALCONY / OPEN BALCONY & TERRACE AREA / SERVICE LEDGE / NET BUILTUP AREA
  4. COMMON AREA LOADING : TOILET / NON APPROCHABLE TERRACE / REFUGE / PASSAGE AREA / FIRE STAIRCASE WITH LIFT & LOBBY / PARKING AREA / RECREATIONAL AREA
  5. SUPER BUILTUP AREAS: SUPERBUILTUP AREA IN SQ MT / SUPERBUILTUP AREA IN SQ FT
  6. LOADING RATIO OF CARPET / SUPER BUILTUP : AS ACTUALS / ACCORDING TO 65 %

FLOOR WISE COMMON AREA :

  1. TOILET
  2. NON APPROCHABLE TERRACE
  3. REFUGE AREA
  4. PASSAGE AREA
  5. FIRE STAIRCASE & FIRE LIFT
  6. MAIN STAIRCASE WITH LIFT & LOBBY
  7. PARKING
  8. RECREATIONAL AREA

Tentative Demand Calculation Charges NMC :  – 

 

TD R. Conversion / Transfer Charges
Administrative fees
Development Fund / Improvement Size (Peripheral Development Expenditure) 
Mitigation charges 
Building drawing inspection fee
Building materials charges
building sketch registration fee 
Building permit fee
periodic inspection fee 
Ancillary Area
Administrative charges levied for sewerage connection
Land Transferable Development Rights Premium and and burden premium charges
narrow eye 
Deposit amount
Deposit (Amount to be taken at the time of issue of building permit 
M. Prof. Ni. And the construction development fee charged under section 124/B of the Town Planning Act
M. Prof. Ni. and land development charges levied under Section 124/B of the Town Planning Act 
M. Prof. Ni. and Building Development Charges levied under Section 124 of the Town Planning Act (under Addl. FSI 124/J)
Additional carpet area under Nagpur Metro Rail Corridor
Land transferable development rights premium and burden premium charges 
Heritage Fund 
Tree Conservation Fee
Construction Workers Welfare Cess Fund (1 percent of construction cost)

Tentative Demand Calculation Charges NIT :  

SCRUTINY CHARGES / ADDITIONAL SCRUTINY CHARGES FOR DIFF. IN BUILT AREA
BUILDING CONSTRUCTION CHARGES 
STACKING CHARGES 
SECURITY DEPOSIT
RAIN WATER HARVESTING DEPOSIT
EMD FOR TREE PLANTATION 
BKKU (BANDHAKAM KAMGAR KALYAN UP-KAR 
HERITAGE FUND 

ADDITIONAL REGULARISATION CHARGES FOR TRANSFER OF PROPERTY @RS. 16/SQ.FT (PLOT AREA SQ.MT X REGULARIZATION RATE FOR PLOT AREA SQ.MT) 

MUTATION CHARGES FOR TRANSFER OF PROPERTY INCLUDING LEGAL HEIRS (RATE FOR MUTATION OF LEGAL HEIRS X 1) = (500*1)
PREMIUM OF ANCILLARY AREA 
PREMIUM AMOUNT FOR LAND USE CHANGE 
PREMIUM AMOUNT FOR EXTRA FSI 
PREMIUM AMOUNT FOR EXTRA FSI (GOVERMRNT SHARE) 
BASEMENT
Electrical Internal Wall Conduit
Internal Plaster
Floor Chipping & Cleaning
Trimix
Tiles
External plumbing
Common Lobby Flooring
Common Lobby doors
Common Lobby Dado
Main Staircase Flooring
Main Staircase Railing
Main Staircase Wiring
Main Staircase Fixtures
Garbage Chute Works
Fire Staircase Flooring
Fire Staircase Railing
Fire Staircase Wiring
Fire Staircase Fixtures
External Brickwork for Ramp
Racks for DG on Ramp
Sensors
Footlamps
Traffic signal painting 
Signanges and boards
Basement Ventilation 
Testing of Fire Works 
Fire Door
BRICK WORK (UPTO LINTEL)
LINTEL CASTING
BRICK WORK (FINAL)
CONCEALED PLUMBING
FLOOR CHIPPING & CLEANING
ELETRICAL FLOOR CONDUIT 
LIFT WALL BRICKWORK 
LIFT WALL PLASTER 
LIFT OPENING GRANITE JAMMING 
COMMON LOBBY PLASTER 
COMMON LOBBY WALL TILE/PAINT 
COMMON LOBBY FLOOR TILE FIXING 
COMMON LOBBY LIGHT FIXING 
LIFT INNER PLASTER 
LIFT INNER WHITE WASH 
LIFT INNER LIGHT INSTALATION 
LIFT INSTALATION 
LIGHTS FITTINGS
SITE CLEANING
FIRE SPRINKLERS AND WORKS 
EARTHING PIT 
RNU
 
 
GROUND FLOOR (PARKING)
Final Brickwork
Internal Plaster 
Internal Paint
External Plaster 
External Paint
External plumbing
Common Lobby Flooring
Common Lobby doors
Internal Door Fittings
Main Staircase Flooring
Main Staircase Railing
Main Staircase Wiring
Main Staircase Fixtures
Fire Doors
Fire Staircase Flooring
Fire Staircase Railing
Fire Staircase Wiring
Fire Staircase Fixtures
Concealed Plumbing
Electrical floor and wall conduit
Floor Tiles and Skirting 
Parking Tiles
Common Lobby Dado
Window Fitting 
Door Jamming
Window Jamming
Meter Panel Wiring
Meter Panel Installation
Transformer Platform 
Transformer Installation 
Transformer Wiring
Compound wall Foundation 
Compound wall Plaster
Compound wall Painting
Guard Room Brickwork
Guard Room External Plaster
Guard Room  External Painting
Guard Room Internal Plaster
Guard Room  Internal Painting
Main Gate Installation and MS
Lift Opening Granite Jamming
Lift Inner Plaster
Lift Inner Light
Lift Installation
Signanges
DG
Entrance Lobby desk and Chairs
ICT Works
Fire Works and testing
Walkway Pergolas
MS Structures for Pergolas
WINDOW FRAMING
WINDOW FIXING
LIFT WALL BRICKWORK 
LIFT WALL PLASTER 
LIFT OPENING GRANITE JAMMING 
COMMON LOBBY PLASTER 
COMMON LOBBY WALL TILE/PAINT 
COMMON LOBBY FLOOR TILE FIXING 
COMMON LOBBY LIGHT FIXING 
LIFT INNER PLASTER 
LIFT INNER WHITE WASH 
LIFT INNER LIGHT INSTALATION 
LIFT INSTALATION 
LIGHTS FITTINGS
SITE CLEANING
FIRE SPRINKLERS AND WORKS 
EXTERNAL VERTICLE PLUMBING
FIRE PUMPS
 
FIRST FLOOR :
Tiling of Toilets 
Waterproofing of Toilets
Dado of toilets
Internal Plaster 
Internal Paint
Common Lobby Flooring
Common Lobby doors
Main Staircase Flooring
Main Staircase Railing
Main Staircase Wiring
Main Staircase Fixtures
Fire Staircase Flooring
Fire Staircase Railing
Fire Staircase Wiring
Fire Staircase Fixtures
Concealed Plumbing
Electrical floor and wall conduit
Floor Tiles and Skirting 
Common Lobby Dado
Window Fitting 
Door Jamming
Window Jamming
Door Fitting
Light Switches 
Lift Opening Jamming
Common Lobby Light Fixing
Lift Inner Plaster
Lift Inner Light
Lift Installation
Vertical Plumbing
External Glazing 
Internal Glazing
External Development
Façade 
Façade Lighting
Gym Equipments
Party Hall overall Cost 
Game Zone equipemts and overall 
Gym Flooring 
Party Hall Flooring
Game Zone Flooring
Entrance Lobby desk and Chairs
ICT Works
Fire Works and testing
Fire Door
SWIMMING POOL ELETRIC CONDUICTING 
SWIMMING POOL CONCELED PLUMBNG 
SWIMMING POOL WALL CASTING 
SWIMMING POOL PLASTER 
SWIMMING POOL TILING 
SWIMMING POOL GROUTING 
SWIMMING POOL ELETRICAL AND PLUMBING FITTING 
SWIMMING POOL FILTRATION PLANT & OTHER EQUIPMENT INSTALATION 
SWIMMING POOL/TESTING & COMMENCING 
Gym Ligting and wiring
Party Hall  Ligting and wiring
Game Zone Ligting and wiring
BRICK WORK (UPTO LINTEL)
LINTEL CASTING
BRICK WORK (FINAL)
ELECTRICAL INTERNAL WALL CONDUIT
TOILET, KITCHEN PLASTER
CONCEALED PLUMBING
External Plaster
SANITARY FITTING INSTALATION 
ELETRICAL WIRING 
INTERNAL PAINTING
LIGHTS & SWITCHES INSTALATION 
EXTERNAL VERTICAL PLUMBING 
EXTERNAL PLUMBING/SEWERAGE
EXTERNAL GLAZING 
EXTERNAL FINISH (DUCT COVER)
GLASS WORKS (EXTERNAL)
FIRE DOORS
 
TYPICAL FLOOR
BRICK WORK (UPTO LINTEL)
LINTEL CASTING
BRICK WORK (FINAL)
ELECTRICAL INTERNAL WALL CONDUIT
TOILET, KITCHEN PLASTER
INTERNAL GYPROC PLASTER
CONCEALED PLUMBING
BATHROOM WATERPROOFING
FLOOR CHIPPING & CLEANING
ELETRICAL FLOOR CONDUIT 
BATHROOM WALL TILES
BATHROOM FLOOR TILES FIXING
BALCONY WATERPROOFING 
FRONT EXTERNAL PLASTER
RIGHT SIDE EXTERNAL PLASTER
LEFT SIDE EXTERNAL PLASTER
BACK SIDE EXTERNAL PLASTER
TOILET GRANITE DOORS FRAMING
WINDOW GRANITE FRAMING 
FLOOR TILES & SKIRTING
KITCHEN OTA FIXING 
KITCHEN DADO 
COMMON LOBBY DADO
COMMON LOBBY TILE FITTING
WINDOW FITTING
MAIN DOOR AND INTERNAL DOORS FITTING
SANITARY FITTING INSTALATION 
ELETRICAL WIRING 
INTERNAL PAINTING
LIGHTS & SWITCHES INSTALATION 
METER PANNEL TO FLAT WIRING 
COMMON LOBBY ELETRICAL CONDUIT 
MAIN STARICASE ELETRICAL 
FIRE STAIRCASE ELETRICAL 
LIFT WALL BRICKWORK 
LIFT WALL PLASTER 
LIFT OPENING GRANITE JAMMING 
COMMON LOBBY PLASTER 
MAIN STAIRCASE PLASTER 
FIRE STAIRCASE PLASTER 
COMMON LOBBY WALL TILE/PAINT 
COMMON LOBBY FLOOR TILE FIXING 
MAIN STAIRCASE STEPS & MIDLANDING GRANITE FXING 
FIRE STAIRCASE STEPS & MIDLANDING GRANITE FXING 
COMMON LOBBY LIGHT FIXING 
STAIRCASE LIGHT FIXING 
LIFT INNER PLASTER 
LIFT INNER WHITE WASH 
LIFT INNER LIGHT INSTALATION 
LIFT INSTALATION 
TERRACE WATERPROOFING
EXTERNAL VERTICAL PLUMBING 
EXTERNAL PLUMBING/SEWERAGE
COMMON LOBBY FLOORING
MAIN STAIRCASE STAIRCASE RAILING
FIRE STAIRCASE RAILING
EXTERNAL GLAZING 
EXTERNAL FINISH (DUCT COVER)
HORTICULTURE
LIGHTS FITTINGS
SITE CLEANING
FAÇADE 
FAÇADE LIGHTING 
ENTRANCE LOBBIES DESK AND CHAIRS 
OHWT
HVAC 
ICT WORKS 
FIRE SPRINKLERS AND WORKS 
ACP WORKS 
GLASS WORKS (EXTERNAL)
FIRE DOORS
 
 
PENTHOUSE 
BRICK WORK (UPTO LINTEL)
MS LINTEL PLATES
LINTEL CASTING
BRICK WORK (FINAL)
ELECTRICAL INTERNAL WALL CONDUIT
TOILET, KITCHEN PLASTER
INTERNAL GYPROC PLASTER
CONCEALED PLUMBING
BATHROOM WATERPROOFING
FLOOR CHIPPING & CLEANING
ELETRICAL FLOOR CONDUIT 
BATHROOM WALL TILES
BATHROOM FLOOR TILES FIXING
BALCONY WATERPROOFING 
FRONT EXTERNAL PLASTER
RIGHT SIDE EXTERNAL PLASTER
LEFT SIDE EXTERNAL PLASTER
BACK SIDE EXTERNAL PLASTER
TOILET GRANITE DOORS FRAMING
WINDOW GRANITE FRAMING 
FLOOR TILES & SKIRTING
KITCHEN OTA FIXING 
KITCHEN DADO 
COMMON LOBBY DADO
COMMON LOBBY TILE FITTING
WINDOW FITTING
MAIN DOOR AND INTERNAL DOORS FITTING
SANITARY FITTING INSTALATION 
ELETRICAL WIRING 
INTERNAL PAINTING
LIGHTS & SWITCHES INSTALATION 
SWIMMING POOL PLANT ROOM PLUMBING
SWIMMING POOL PLANT ROOM MACHINES
JACCUZZI FLOORING
WATERFALL WALL DEVELOPMENT
SWIMMING POOL ELETRIC CONDUICTING 
SWIMMING POOL CONCELED PLUMBNG 
SWIMMING POOL WALL CASTING 
SWIMMING POOL PLASTER 
SWIMMING POOL TILING 
SWIMMING POOL GROUTING 
SWIMMING POOL ELETRICAL AND PLUMBING FITTING 
SWIMMING POOL FILTRATION PLANT & OTHER EQUIPMENT INSTALATION 
SWIMMING POOL/TESTING & COMMENCING 
METER PANNEL TO FLAT WIRING 
ITC RACKS
PRIVATE LIFT
INTERNAL STAIRCASE FLOORING
INTERNAL STAIRCASE RAILING
INTERNAL STAIRCASE LIGHTING
INTERNAL LANDSCAPE NEAR INTERNAL STAIRCASE
INTERNAL LANDSCAPE NEAR INTERNAL STAIRCASE CONDUIT
INTERNAL LANDSCAPE NEAR INTERNAL STAIRCASE WATERPROOFING
INTERNAL LANDSCAPE NEAR INTERNAL STAIRCASE ELECTRCAL FIXTURES
INTERNAL LANDSCAPE NEAR INTERNAL STAIRCASE WIRING
INTERNAL LANDSCAPE NEAR INTERNAL STAIRCASE DRIPPING SYSTEM
COMMON LOBBY ELETRICAL CONDUIT 
MAIN STARICASE ELETRICAL 
FIRE STAIRCASE ELETRICAL 
LIFT WALL BRICKWORK 
LIFT WALL PLASTER 
LIFT OPENING GRANITE JAMMING 
COMMON LOBBY PLASTER 
MAIN STAIRCASE PLASTER 
FIRE STAIRCASE PLASTER 
COMMON LOBBY WALL TILE/PAINT 
COMMON LOBBY FLOOR TILE FIXING 
MAIN STAIRCASE STEPS & MIDLANDING GRANITE FXING 
FIRE STAIRCASE STEPS & MIDLANDING GRANITE FXING 
COMMON LOBBY LIGHT FIXING 
STAIRCASE LIGHT FIXING 
LIFT INNER PLASTER 
LIFT INNER WHITE WASH 
LIFT INNER LIGHT INSTALATION 
LIFT INSTALATION 
TERRACE WATERPROOFING
EXTERNAL VERTICAL PLUMBING 
EXTERNAL PLUMBING/SEWERAGE
AUTOMATION WORKS 
FIRE WORKS 
COMMON LOBBY FLOORING
BALCONY STEPS CIVIL
BALCONY STEPS WATERPROOFING
BALCONY STEPS FLOORING
BALCONY STEPS RAILING
SOLAR WORKS 
MAIN STAIRCASE STAIRCASE RAILING
FIRE STAIRCASE RAILING
EXTERNAL GLAZING 
EXTERNAL FINISH (DUCT COVER)
HORTICULTURE
LIGHTS FITTINGS
SITE CLEANING
FAÇADE 
FAÇADE LIGHTING 
EXTERNAL DEVELOPMENT 
GYM EQUIPMENTS AND OTHER AMMENITIES
GYM FLOORING
GYM LIGHT FIXTURES
GYM WIRING AND CONDUITING
PARTY DECK FLOORING
PARTY DECK LIGHTING FIXTURES
PARTY DECK WIRING AND CONDUITING
STEAM AREA FLOORING 
STEAM AREA INTERNAL PLASTER
STEAM AREA FIXTURES
STEAM AREA WIRING AND CONDUITING
MASSAGE ROOM FLOORING 
MASSAGE ROOM INTERNAL PLASTER
MASSAGE ROOM FIXTURES
MASSAGE ROOM WIRING AND CONDUITING
LIGHTENING ARRESTOR
PERGOLAS
GYM EQUIPMENTS AND OTHER AMMENITIES
PARTY HALL 
GAME ZONE 
ENTRANCE LOBBIES DESK AND CHAIRS 
GYPSUM PARTITIONS
OHWT
HVAC 
ICT WORKS 
FIRE SPRINKLERS AND WORKS 
FIRE PUMPS
ACP WORKS 
GLASS WORKS (EXTERNAL)
FIRE DOORS
GARBAGE CHUTE WORKS 
KITCHEN AREA MODULAR DESIGN 
KITCHEN APPLIANACES
DINNING AREA JHULA
GLASS PARTITIONS
BISON BOARD PARTITIONS
ACCOUSTIC PANELS
SPEAKERS – THEATRE ROOM 
THEATRE ROOM – FLOORING
POP FOR ALL AREAS
PUNNING FOR ALL AREAS 
FIXED FURNITURE
LOOSE FURNITURE
ROOF STRUCTURE
FABRICATIONS 
FINAL POLISHING 

1 SQ METER = 10.764 SQ FT

1 ACRE = 43,560 SQ FT

1 HECTARE = 2.47 ACRES

1 SQ YARD = 9 SQ FT

1 SQ KM = 247.1 ACRES

1 SQ MILE  = 640 ACRES

1 GUNTHA = 1089 SQ FT

1 CENT = 435.6 SQ FT

100 CENT = 1 ACRE

1 ANKANAM = 72 SQ FT

1 GAJ = 9 SQ FT

1 CHATAK = 45 SQ FT

1 MARLA = 272 SQ FT

1 KANAL = 5445 SQ FT

 8 KANAL = 1 ACRE

1 ARE = 1076.4 SQ FT

 1 GROUND = 2400 SQ FT